During Air Marshall's overhaul and upgrade to the Reading Cinema Complex they upgraded the boiler system and Building Management System controls and designed and engineered a new Economy Cycle Damper system.
Reading Cinemas Gas Fired Boiler Upgrade:
Carried out a complete overhaul and upgrade to the Reading Cinema Heating Hot Water Boiler system at the Dubbo Cinema Complex. This overhaul included total control, valves and burner replacement.
Reading Cinema Economy Cycle Damper Fitout:
Air Marshall designed and engineered a new economy cycle system to be incorporated into the existing ductwork at Reading Cinemas Dubbo. The current system was not efficient in design and costing the client a lot of money in the operation of the plant.
Reading Cinemas Control Upgrade Dubbo:
Air Marshall carried out a complete control upgrade of the Reading Cinema Complex. The BMS (Building Management System) was responsible for total HVAC plant management, toilet exhaust fans through to restaurant extraction and HHW (Heating Hot Water) supply. This project once completed, has proven to save the client 80% in operation costs on their Power and Gas services.